CIVIC — 2023
Saltmarsh Station
A small coastal transit hall built to flood, drain, and carry on.
01 — Brief
A vulnerable stretch of coast needed a new ferry and bus interchange on ground that will, with near-certainty, flood within the building's lifetime. The council's brief quietly assumed a structure that would be written off in thirty years. We were asked to design for that. We proposed designing against it.
02 — Approach
The hall stands on a raised concrete table with everything vital — power, ticketing, shelter — kept above the modelled flood line. The ground floor is deliberately sacrificial and washable: open, hard-wearing, designed to take water and be hosed clean rather than ruined by it. When the sea comes in, the building lets it pass through and keeps running above.
03 — Outcome
The station has already weathered two surge events with no service interruption and no repair cost beyond cleaning. It reframed the council's own guidance on coastal infrastructure. Completed 2023 — built to outlast the assumption it was meant to accept.
